If the Working Group is new to the process or if you are a new Working Group Chair/Sponsor Chair/Society Liaison and you feel it would be beneficial for staff to give a brief presentation on the process of developing a standard, please check here [ ]
Instructions for Downloading the PAR Form
1. Sponsor Date |
2. Assigned Project |
3. PAR Approval |
Name of Official Reporter (usually the WG Chair) who must be an SA member as well as an IEEE and/or Affiliate Member: | [Wolfgang Roethig] | |||
IEEE Standards Staff has verified that the Official Reporter (or Working Group Chair) is an IEEE and an IEEE-SA member: | [...] (Staff to check box) | |||
Contact Information: | ||||
Telephone | [+1 408 588 5349] | FAX: | [+1 408 588 5349] | |
E-mail: | [wroethig@el.nec.com] |
Name of Working Group Chair (if different than Reporter): | [N/A] | |||
IEEE Standards Staff has verified that the Working Group Chair is an IEEE and an IEEE-SA member: | [...] (Staff to check box) | |||
Contact Information: | ||||
Telephone | [N/A] | FAX: | [N/A] | |
E-mail: | [N/A] |
Name of Sponsoring Society and Committee: | [DASC] | |||
Name of Committee Sponsor Chair: | [Paul Menchini] | |||
IEEE Standards Staff has verified that the Sponsor Chair is an IEEE and an IEEE-SA member: | [...] (Staff to check box) | |||
Contact Information: | ||||
Telephone | [+1 919-479-1670] | FAX: | [+1 919 479-1671
(please notify before faxing)] |
|
E-mail: | [mench@mench.com] |
a. Is this an update to an existing PAR? [NO ]
If YES, indicate PAR Number/Approval Date [N/A]
If YES, is this project in ballot now? [N/A]
[Indicate changes/rationale for revised PAR in Item #16. This should be no more than 5 lines.]
b. Choose one from the following:[x] New standard
[...] Revision of existing standard {number and year} [N/A]
[...] Amendment to an existing standard {number and year} [N/A]
[...] Corrigendum to an existing standard {number and year} [N/A]
[x] Full Use (5-year life cycle)
[...] Trial Use (2-year life cycle)
Choose one from the following:[x] Individual Sponsor Balloting
[...] Entity Sponsor Balloting
[...] Mixed Balloting (combination of Individual and Entity Sponsor Balloting)Expected Date of Submission for Initial Sponsor Ballot: [May 2002]
The language shall model behavior, timing, power, signal integrity, physical abstraction and physical implementation rules of library elements.]
Has the sponsor reviewed the IEEE patent policy with the group??[Yes] {Yes/No}
Are you aware of the possibility of any copyrights relevant to this project?
[Yes] {Yes/No}
Are you aware of the possibility of any trademarks relevant to this project?
[No] {Yes/No}
Are you aware of possible registration of objects or numbers due to this project?
[No] {Yes/No}
Which International Organization/Committee [...]
International Contact Information:
Name: [...]
Address: [...]
Phone: [...]
FAX: [...]
Email: [...]
SCC 10 (IEEE Dictionary) | by DR | {Circulation of DRafts} | |
IEEE Staff Editorial Review by | by DR | ||
SCC 14 (Quantities, Units and Letter symbols) | by DR |
Additional communication and input from other organizations or other
IEEE Standards Sponsors should be encouraged through participation in the
working group or the balloting pool.
The PAR Copyright Release and Signature
Page must be submitted by FAX to 732-562-1571 before this PAR will
be sent on for NesCom and Standards Board approval.
Instructions for Downloading the PAR Form or PAR Signature Page in HTML format:
Enter the date when the PAR will be submitted to the IEEE.
If this PAR is for a new project, leave this space blank. The IEEE Standards Department will assign a number. If this PAR is for a revision of a standard, or if it updates an existing PAR, enter the existing standard or PAR number. Confer with staff for clarification.
Leave blank. The IEEE Standards Department will complete upon approval.
The project title should include the type of document. For example:For the submitter's reference, standards are documents with mandatory requirements and are generally characterized by the use of the verb "shall."
- Standard Test Method for...
- Recommended Practice for...
- Guide for...
Recommended practices are documents in which procedures and positions preferred by IEEE are presented and are generally characterized by the use of the verb "should."
Guides are documents in which alternative approaches to good practice are suggested, but no clear-cut recommendations are made. They are generally categorized by the use of the verb "may."
The title should not contain the acronym "IEEE". This is added to the title when published.
All acronyms should be spelled out.
The copyright form, the last page in the electronic PAR form (and a separate page), must be submitted by FAX to the IEEE-SA office before the PAR will be approved. In order to comply with US copyright law, the IEEE and its legal counsel request that a copyright agreement be signed by the Official Reporter, who is usually the chair of the working group. This signed copyright agreement is an official part of the IEEE Standards Project Authorization Request (PAR). The PAR will not be submitted to the IEEE-SA Standards Board until the copyright agreement is signed by the proper person.
Indicate the Names of the Official Reporter (usually the Working Group Chair). IEEE/IEEE-SA membership is required. If the Working Group (WG) Chair is different from the Official Reporter, enter the name and address in the space provided. Enter the name of the sponsoring society and the name of the sponsoring committee (i.e., Power Engineering/Switchgear, not PE/SWG) responsible for the development and coordination of the project and for the maintenance of the document after approval by the Standards Board. The name entered here should not be confused with the name of the group writing the standard. If the project is sponsored by two or more committees, enter all committee names and indicate that the work is a jointly sponsored project. When a Standards Coordinating Committee (SCC) is developing the document, enter the SCC number and name as the sponsor (i.e., Standards Coordinating Committee 4 - Thermal Rating). Please note that the Official Reporter, Working Group Chair and Sponsor Chair must be IEEE and IEEE-SA members.
a. Is this an update to an existing PAR?If YES, then indicate the original PAR number and approval date and if this effort is in ballot now. Finally, if this PAR is a revision, a short explanation of the changes to the original PAR and rationale MUST be submitted with the PAR revision request in the form of an e-mail message from the sponsor with the revised PAR form attached.
b. Indicate whether this work will result in a new standard, a revision of an existing standard (indicate standard number and year), an amendment (formerly supplement) to an existing standard (indicate standard number and year), or a corrigendum (indicate standard number and year). Amendments are additions to existing standards and may contain substantive corrections and/or errata to the standard. Corrigenda are substantive corrections and/or errata to a standard.
The submittal should clearly and concisely define the scope of the document. The scope generally describes "what" will be done, i.e. the technical boundaries of the project. For example:"Scope: This project will develop a standard protocol for the control of printers. This protocol will be independent of the underlying datastream or page description language used to create the printed page. This protocol will be usable by all classes of printers. This project is limited to management and control of printers and will not include management of control of printing systems or subsystems."
The submittal should clearly and concisely define the purpose of the document. The purpose generally describes "why" a project will be done. For example:"Purpose: There is currently no defined, independent standard for controlling printers. Each vendor builds some control into the underlying page description language or datastream. Without an independent, openly defined protocol, applications and operating systems cannot automatically determine the type of printer being addressed. This protocol will provide a minimum implementation subset which will allow automatic identification and configuration of printers and vendor extensibility to provide for growth and product differentiation."The purpose of the document should be consistent with the description of the document in Item 5, the title in Item 4, and the scope in Item 6. If the title of the document is "Guide for...," it is inconsistent if the purpose states "This document will describe standard criteria..."The scope, purpose and/or title indicated on the PAR should agree in principle with the scope, purpose and/or title stated in the document at the time of submittal to the IEEE-SA Standards Board.
If this is a PAR to revise the standard, explain here why changes are being made to the standard. This may be due to a change in industry, the introduction of new technology, etc.
Identify any standard(s) or project(s) of similar scope(s), both within or outside of the IEEE, and explain the need for an additional standard in this area.
If the project is intended to be submitted to the appropriate international technical committee as the basis of or for inclusion in an international standard, or if this standard is intended to be adopted as the international standard, this should be noted here. It is important for all working group members to be aware of international activity within their area of technical expertise.
No intensive research required; only obvious or general health, safety, or environmental issues that would be affected by this work need to be cited.
If you know of any further information that may assist NesCom in recommending approval for your project, please include this information here.